SIGNIFICANT COST SAVINGS
Cost savings of up to 80% can be achieved over traditional pipeline buoyancy control methods. Cyntech's anchor systems eliminate the need for concrete weights or concrete coated pipe to control pipeline buoyancy. Personnel and equipment hours, materials, storage and transportation costs are all reduced significantly with our exclusive anchor system.
CYNTECH PIPELINE ANCHOR SYSTEM vs CONCRETE WEIGHTS
CYNTECH PIPELINE ANCHOR SYSTEM
CONCRETE WEIGHTS
DESIGN
Cyntech's anchor system is designed to provide a holddown capacity of 2.5 times the buoyant force of the empty pipeline.
Concrete weights typically provide a weight of 1.1 times the buoyant force of the empty pipeline.
SPACING
Typical spacing for NPS-24 pipeline is 33 meters.
Typical spacing for NPS-24 pipeline is 5.6 meters.
STORAGE
Pipeline anchor materials for 10 kilometers of NPS-24 pipeline would require 30 square meters of storage
space.
Concrete weights for 10 Kilometers of NPS-24 pipeline would require 866 square meters of storage space.
TRANSPORTATION
Pipeline anchor materials for 10 kilometers of NPS-24 pipeline would require 3 truckloads.
Concrete weights for 10 kilometers of NPS-24 pipeline would require 199 truckloads.
INSTALLATION
A typical anchor installation crew would consist of a 5 ton picker truck with a hydraulic drive unit, an operator and two laborers.
A typical weight installation crew would consist of a backhoe, an operator and two laborers.
Pipeline anchors pile
Screwing anchors
Pipeline Anchors
Pipeline
Cyntech solar tracking system was designed to maximize your investment. As one of the lowest cost systems on the market, the Cyntech solar tracker will pay you back sooner.
More...
As a technology leader we are continuously searching for new candidates and highly qualified experts for our job openings.